Notes on excavation September 2022
Aims Our first aim was to re-excavate the May 2022 trench and then determine if the ‘hard shoulder’ feature found along the northern edge of the foundation layer abutted or extended below that layer. This feature was a spread of stones in the range of 5cm to 10cm spread out in a band approximately 1.2m …